HV Jointer

Ref#: J001035_1773352986

Type of work

Contract

Country

USA

Start date

March 17th, 2026

Schedule

4 Weeks On / 4 Weeks Off

Take the next step

Apply for this job

This field is for validation purposes and should be left unchanged.
Please include your country code starting with + (for example, +31 for the Netherlands).
Drop files here or
Accepted file types: pdf, docx, Max. file size: 5 MB, Max. files: 1.

    At Atlas NextWave, we connect skilled offshore professionals with the projects powering the global energy transition. We are currently seeking experienced HV Jointers to join the cable installation scope of the project.

    Job description

    HV Jointer - Offshore Wind
    Location: Offshore - United States
    Contract Duration: Through Late 2026
    Rotation: 4 Weeks On / 4 Weeks Off

    This opportunity offers long-term offshore work supporting critical cable infrastructure that connects offshore wind turbines and substations to the power grid. The successful candidates will play a key role in subsea cable pull-in, jointing, and termination activities during offshore installation operations.

    As an HV Jointer, you will be responsible for performing high-voltage cable jointing and termination activities on offshore wind assets. You will support subsea cable pull-in operations, work closely with cable engineers and offshore technicians, and ensure all work is carried out in accordance with offshore safety and quality standards. The role requires strong technical expertise in high-voltage cable systems and the ability to operate effectively within offshore installation environments.

    Key Responsibilities include performing high-voltage cable jointing and termination up to 66kV, supporting subsea cable pull-in operations, collaborating with offshore cable engineers and installation teams, and maintaining strict adherence to offshore safety, quality, and operational procedures.

    Applicants must hold the following certifications and requirements:

    * NKT CB72
    * Pfisterer Size 4
    * GWO Basic Safety Training (BST)
    * GWO Enhanced First Aid
    * GWO Advanced Rescue (training support available if required)
    * Confined Space Training - Medium Risk
    * Offshore Medical (OGUK/OEUK)
    * Chester Step Test
    * IOSH Health & Safety Essentials
    * B1-OCS Work Visa (or willingness to obtain one - support available)

    Project Details:
    Start Date: To be confirmed
    Contract Duration: Through Late 2026
    Location: Offshore United States
    Rotation: 4 Weeks On / 4 Weeks Off

    Through Atlas NextWave, you will have the opportunity to work on one of the fastest-growing offshore wind markets in the world while contributing to large-scale renewable energy infrastructure.

    Download Aspect Ratio 1 1

    Miah Ibanez

    Consultant

    Take the next step

    Share this job