vEFK WTG

Ref#: J026117_1795685030

Type of work

Contract

Country

Germany

Start date

January 1st, 2027

Duration

5 months

Schedule

Monday Friday

Take the next step

Apply for this job

This field is for validation purposes and should be left unchanged.
Please include your country code starting with + (for example, +31 for the Netherlands).
Drop files here or
Accepted file types: pdf, docx, Max. file size: 5 MB, Max. files: 1.

    Job description

    Role Title: vEFK WTG

    Base Location: Germany Onshore // Offshore

    Working Pattern: Project Office Monday - Friday (8 Hours a day) // Offshore SOV 14/14

    Engagement: External Consultant working on AUG Contract

    Starting: December 2026 // January 2027 Latest

    Duration: 5 Months Initial - Potential to extend // temp to perm

    • Shall have experience with Wind Turbine Safety Rules (at least Authorising Engineer).
    • Shall be qualified as vEFK acc. VDE 1000-10 (Bachelor, Bachelor Professional, Master Craftsman, or comparable EQF level 6 in Electrical Engineering).
    • Shall have knowledge of German rules and legislation reg. electrical safety. (DGUV, BetrSichV, VDE)
    • German language skills (at least B2) are desirable.
    • Responsible for instructing and training WTG technicians as Skilled Person (electrical) acc. EN 50110-1 / VDE 0105-100. Works onshore in Norddeich Office, partly (between 20% and 60% of working time) offshore on SOV (14/14 rotation).
    • If qualified for HV systems, may support in training of HV technicians (Electrical Safety Rules).
    • Reports to Manager HV and Transmission.

    1741771535935 Aspect Ratio 1 1

    James Stevens

    Senior Consultant

    Take the next step

    Share this job