Senior Electrical Engineer – Transmission Package
Type of work
Contract
Country
Poland
Start date
November 1st, 2026
Duration
> 1 year
Schedule
14 Days on/ 14 Days off
Description:Role Objective / Success Criteria / KPI
· Responsible for the electrical supervision, electrical QC and commissioning activities
· Manage the overall commissioning planning within the agreed construction schedule.
· Manage overall commissioning planning, time schedule and quality control during electrical installation (LV, MV, HV and SCADA components)
Key Responsibilities
· To ensure on time commissioning of the onshore substation ready for handover to operation
· Establish and manage the onshore commissioning organisation within the full electrical scope incl. installation, quality and commissioning of LV,MV,HV, protection and SCADA equipment
· Manage the overall commissioning planning within the agreed construction schedule.
· Coordinate commissioning activities with main suppliers and sub-contractors.
· Coordinate project commissioning activities
· Secure quality of commissioning works and documentation
· Report installation and commissioning progress/participate in commissioning meetings
· Ensure that quality is within the agreed standard during construction
· Ensure all commissioning is completed in due time and to agreed standard
· Give input to Design Critical to Quality (CTQ)
· After contract signing ensure updating of Critical to Quality (CTQ) and control of CTQ is transferred to Quality Activity Schedule (QAS)
Tasks
· Manage overall commissioning time schedule, including key milestones
· Supervision and quality control during mounting/installation of electrical systems.
· Coordinate the electrical installation & commissioning activities performed by suppliers, contractors and DONG Energy
· Participate in witnessing of FAT
· Coordinate and participate in witnessing of SAT
· Coordinate and execute the SIT test
· Ensure that the commissioning activities are in compliance with the project HSE rules and local legislation
· Report commissioning activities to the project and to the site management
· Coordinate Commissioning with grid company / authorities / Lead Commissioning manager / SAPs
· Contribute actively to evaluation of the project and capture lessons learnt throughout the project
· Create and monitor execution of QAS and align input from SQM
· Review of ITPs from Supplier and ensure verification and validation of product quality controls (QC)
· Management of product NCR
· Review of product and as-built documentation during AP execution phase
· Ensure maintenance is performed according to manual.
Deliverables
· Commissioning Management Plan
· Input to Technical Record File (TRF)
· Input to HSE and HAZID
· Input to tender material
· Quality Activity Schedule (QAS)
· Commissioning CTQ's
· Control plans
· Product Conformance report
· Status reports
Project Documents
· Maintenance and service documentation
· Aconex punch list
· Status reporting from construction site
· Lessons learnt
· QA plan
· Comm. Matrix
· Commissioning panel meetings
· Peer Reviews (own scope)
Decision authority / Responsibility
· Request commissioning resources internally and externally including replace resources if required
· Launch required project activities in order to facilitate commissioning progress within approved scope and budget
· Propose mitigations and supplier follow-up actions to the Substations project manager and Electrical project manager
· Take site specific/quality decisions in relation to suppliers.
Qualifications / Requirements
· Five years of relevant project experience required
· Good project management skills, coordination skills and a talent for driving solutions to achieve outcomes in a fast-paced environment
· A strong personal drive and a proactive mindset
· Commissioning experience within the field of MV/HV equipment, SCADA, low voltage and utility installations and components
· Experience with offshore substation work.
Share this job